Scope included: HV infrastructure design and installation, SCADA control system, lightning protection, DALI, fibre optic and copper communications.
Contract Value | $1.5M – $2.5M |
---|
Scope included: HV infrastructure design and installation, SCADA control system, lightning protection, DALI, fibre optic and copper communications.
Contract Value | $1.5M – $2.5M |
---|